Know Your Body,
Train Smarter
Strain, Recovery, and Sleep scores powered by your Apple Watch and HealthKit. Understand your body and optimize every day.
We help you understand your body through data, so you can train smarter and recover better.
Your body, scored daily
Strain, Recovery, and Sleep at a glance. See how ready you are to train, how well you recovered, and whether your sleep is keeping up, all in one score.
Your biometrics, captured automatically
Sleeping heart rate, HRV, respiratory rate, SpO2, and wrist temperature, all tracked from your Apple Watch through HealthKit. No manual logging, no extra setup.
All your workouts, one place
Monthly stats, activity heatmap, and a full log of every workout. See your total distance, calories, and duration at a glance, across running, cycling, swimming, and more.
Every workout, fully analyzed
Route maps, heart rate zones, duration, distance, calories, and per-session training load. Run, ride, swim, or hike and get the full picture.
Steps that tell a story
Daily step count with comparisons to your typical day. Distance, flights climbed, active duration, and a progress chart, so you always know where you stand.
Breathe with purpose
Guided breathing exercises from calming Physiological Sighs to energizing Power Breathing. Choose a technique, follow the visual pacer, and feel the difference in minutes.
AI Coach
An AI coach that actually knows you. It studies your heart rate, recovery, sleep, and workout history to build recommendations that evolve as you do. Every insight is generated on your device, so your data stays yours.
Every way you move
Running
Walking
Indoor Walking
Hiking
Cycling
Indoor Cycling
Pool Swim
Open Water Swim
Strength
HIIT
Yoga
Dance
Elliptical
Rowing
Indoor Rowing
Stair Climbing
Cross Training
Core Training
Tennis
Soccer
Basketball
Downhill Skiing
Cross Country Skiing
Kickboxing
Other
Start understanding your body
Wildgrow is free. Your health data stays on your device, powered by Apple HealthKit. No subscriptions, no hidden costs.
Coming soon to the App Store.
Frequently Asked Questions
Is Wildgrow free?
Yes. All features are included at no cost: health scores, activity tracking, breathwork, and body metrics.
What health metrics does it track?
Resting heart rate, heart rate variability (HRV), blood oxygen (SpO2), respiratory rate, wrist temperature, sleep stages, steps, and training load. All sourced from Apple HealthKit.
How does Training Load work?
Training Load uses zone-weighted active minutes to calculate how hard you're training. It compares your acute load (recent activity) to your chronic load (long-term baseline) and shows a training balance ratio so you can avoid overtraining.
What breathing exercises are included?
Five guided protocols: Physiological Sigh for quick calm, Box Breathing for focus, 4-7-8 for relaxation, Diaphragmatic Breathing for recovery, and Power Breathing for energy. Each session is animated with customizable rounds.
Where is my health data stored?
All your health data is stored securely in Apple HealthKit on your device. Wildgrow never sends your data to external servers. Your privacy is built into the architecture.
What activities can I track?
Wildgrow supports running, walking, cycling, swimming, hiking, HIIT, and many more activity types. Each workout includes detailed analytics like heart rate zones, route maps, elevation, splits, and training load contribution.